Went for a drive this morning to see how the Valley Line is coming together. Looks pretty good, there were about 6 or 7 Flexities parked on the track along 66/75 St.
Anyways, I came home through the core and up through Kingsway/NAIT. The lights turned red as I was coming up Kingsway and the train came up from the south at what seemed to be a good speed into Kingsway/Royal Alex. Lights turned green, so I went up 106 to see how fast the train was running. I was going 50, the lights before the crossing turned red and the train came through, so it seems that they're running at a good clip now. Light turned green and I turned left onto PEA, and the crossing gates came down, the train that was at NAIT left the station, and that was it. It all seemed to be working well. I know mid-Saturday morning is not the best time of week to be gauging things, but it seems to be working much better now.
Anybody ride the train since the new signalling was switched on?