CNIB Redevelopment | 106m | 32s | ONE Properties | Wallman Architects

What do you think of this project?


  • Total voters
    67
I could rave at length re this macro-mosaic tower. It has great street-front presence along Jasper Ave. This is the kind of development that gives a high-rise tower uber-positive presence. It will be a great foil against the Pearl, complimentary without emulating. These two will form the western Gate of Jasper. *****stars
 
Was at the EDC presentation. A few changes, height brought down to 32s. Transparent glazing reduced to meet energy code - but not be typical spandrel, the design fits the framework pattern (which remains, though wider upper floor balconies now add something of a tapering effect to the design). Balconies are now half-inset rather than fully-inset.

Podium looks more transparent than from earlier renders. Retail now broken down into 4 smaller units. Patio space earmarked to wrap the corner.

CNIB office takes about 10,000 sqft on the 2nd floor podium. Residential amenity on the east part of the podium roof. Rooftop amenity and observation deck, too, though private I think.

Trees along Jasper and 120 St will be replaced, "Silva cells" will be used to help maintain their health.

Still lots of good design geared toward their visually impaired, using differentiated paving, acoustical differentiation etc. Chris Downey was the consultant on these elements.

Overall still really like this one a lot, and think it will be excellent.
 
Last edited:
Reference ID: Job No 300122107-001
Description: To construct a Mixed Use Building - Apartment House (333 Dwellings) with General Retail on the main floor, Professional Financial Office Support Services on the 2nd floor and an underground parkade (4 levels)
Location: 12010 - JASPER AVENUE NW
Plan 4423AJ Blk 20 Lot 4
12010 - JASPER AVENUE NW
Plan 4423AJ Blk 20 Lot 3
12010 - JASPER AVENUE NW
Plan 4423AJ Blk 20 Lot 2
12010 - JASPER AVENUE NW
Plan 4423AJ Blk 20 Lot 1
Applicant: SLINKO, ANDREW
Status: Intake Review
Create Date: 12/10/2018 2:44:27 PM
Neighbourhood: OLIVER
 
Current permit state:

Reference ID: Job No 300122107-001
Description: To construct a 107.65m (32 Storey) mixed-Use Tower, with Commercial podium to include Professional, Financial and Office Support Services (CNIB offices and lobby), General Retail Stores, and Residential lobby; and an Apartment Housing Tower (333 Dwelling units on Floors 3 -20) and an underground parkade. (CNIB)
Location: 12010 - JASPER AVENUE NW
Plan 4423AJ Blk 20 Lot 4
12010 - JASPER AVENUE NW
Plan 4423AJ Blk 20 Lot 3
12010 - JASPER AVENUE NW
Plan 4423AJ Blk 20 Lot 2
12010 - JASPER AVENUE NW
Plan 4423AJ Blk 20 Lot 1
Applicant: SLINKO, ANDREW
Status: In Development Review
Create Date: 12/10/2018 2:44:27 PM
Neighbourhood: OLIVER
 
Reference ID: Job No 300122107-005
Description: To demolish a Professional, Financial, Office Support Service building.
Location: 12010 - JASPER AVENUE NW
Plan 4423AJ Blk 20 Lot 4
12010 - JASPER AVENUE NW
Plan 4423AJ Blk 20 Lot 3
12010 - JASPER AVENUE NW
Plan 4423AJ Blk 20 Lot 2
12010 - JASPER AVENUE NW
Plan 4423AJ Blk 20 Lot 1
Applicant: ELLISDON CONSTRUCTION SERVICES INC.
Status: Completed
Create Date: 1/30/2019 4:02:39 PM
Neighbourhood: OLIVER
 
@StopDropandLOL I'm pretty sure that the design hasn't changed very much besides the slight lowering of hight and the balconies becoming half-inset
 

Back
Top