40 St is complete and they’re now working on Hermitage Road eastbound. Turned out better than I imagined. Instant protected bike lanes. A couple of pickup truck owners seemed to be annoyed by the presence of these encumbrances.
Sometimes, it just takes little things.40 St is complete and they’re now working on Hermitage Road eastbound. Turned out better than I imagined. Instant protected bike lanes. A couple of pickup truck owners seemed to be annoyed by the presence of these encumbrances.
View attachment 585155
I’m interested on how this will all feel in the end in terms of value. Currently we’re on target for 1mil per km.40 St is complete and they’re now working on Hermitage Road eastbound. Turned out better than I imagined. Instant protected bike lanes. A couple of pickup truck owners seemed to be annoyed by the presence of these encumbrances.
View attachment 585155
104 Avenue diverges east of 102 Street, with the radical lane shift going one land south. There's a double left turn lane from 104 Ave East to 101 Street north.Yep, from my experience it's a truly awful place to cross the street in pretty much any direction
Fortunately, it's due to get a little better with the pedway/streetscaping project that's underway.This is 104 Ave at 101 Street. I can't believe how wide and ugly this beast of a street is (104 Ave) to cross as a pedestrian, which I haven't done for a long while at 101st.
A guy with a bit of a mobility issue was already part way across when I started to cross and two vehicles turned left in front of him (impatient to wait) as he got to the halfway point. It took him almost the full amount of time before the signal turned to get across (and it wasn't a short light and he wasn't that slow) - and this is in summer conditions.
View attachment 585279
From what I saw, they decided not to put the summer bicycle lanes back in on Stanley Park Dr (ala Victoria Park Rd) and then they also removed the Beach Ave lane to restore two way vehicular traffic (remember 100 Ave overlooking Victoria Park debacle?)I’m interested on how this will all feel in the end in terms of value. Currently we’re on target for 1mil per km.
This is awesome. AND, this is still a non permanent, cracked asphalt, pretty unsightly bike lane. Nothing to feel much pride in. Is it cheaper to do this and then make them permanent when renewals come up?
Or should we just “do it right” the first time?
I’m interested on the tradeoffs. Biggest risk being what we’ve seen elsewhere…. A turn in the political majority that leads to the removal of all this work in 3-6 years. If it can happen in Vancouver, we aren’t safe.
I'd love to bike around Victoria one day.I visited Victoria the past few days and one change I saw around downtown was the growth in separated bike lanes. A lot of bike signals at many downtown intersections, but a lot of bikes too. A lot of traffic calming too.
I find it odd that in 2016, they decided a full lane jog through an intersection was a good idea.104 Avenue diverges east of 102 Street, with the radical lane shift going one land south. There's a double left turn lane from 104 Ave East to 101 Street north.
Yeah. That was one of our many roads where we just had super-wide luxury lanes, wasn't it?With 40 St and Hermitage Road, they didn't take away any road lanes. So I'm optimistic there'll be less pushback and it'll be here to stay until they make it permanent with a future neighbourhood renewal. And we have 3.5km of new protected bike infrastructure for less than a quarter million? And it will hopefully help slow down traffic which Hermitage Rd residents have been complaining about for years.
Honest question. How does snow shovelling/removal work with those barriers in place? Do they get removed in the winter?40 St is complete and they’re now working on Hermitage Road eastbound. Turned out better than I imagined. Instant protected bike lanes. A couple of pickup truck owners seemed to be annoyed by the presence of these encumbrances.
View attachment 585155