BrettB
Active Member
Good video analyzing the city's bike infrastructure plans
The pole in the middle of the sidewalk on 142nd St has been removed, leaving just the base. Why could this not have been done before the new sidewalk poured right to the light? Sigh
View attachment 579048
The real question is will Alldritt ever develop anything on any of their pieces of land.
City proposes renewing Wîhkwêntôwin to prioritize pedestrians over cars
As it prepares for neighbourhood renewal in Wîhkwêntôwin, the City of Edmonton wants feedback on its design proposals for new bike infrastructure, traffic-calming measures, and linear parks in place of portions of roads.edmonton.taproot.news
City administration has also proposed to close 97 Avenue east of 110 Street to drivers. This closure would cut off one vehicular access point to the High Level Bridge from the neighbourhood, and connect Constable Ezio Faraone Park to the Ribbon of Steel shared-use path. The current design involves two right-turn slip lanes intersecting with the shared-use path.
Coincidentally, Budnick said the Edmonton Bike Coalition was leading a tour through Wîhkwêntôwin earlier this month to discuss the proposal when participants watched a driver hit a cyclist who was crossing the street at that exact spot.
“This is a very busy city park, so (the proposed closure is) a good opportunity to really massively increase safety at common conflict points,” Budnick said.
It would be a viable and reasonable option.^ Like that idea a lot. Do wonder about traffic volumes though, 97 ave to get to 110th is a pretty busy route for those getting into SE Wihkwentowin albeit a left turn signal on 109 and 99 ave probably solves that problem.