Cycling and Active Transportation in Edmonton

IMG_1819.jpeg

New foot bridge in the North east.
 
It's a bit too bad that they couldn't have been finished before the back-to-school rush, but I guess they should be done before the winter.

I also wonder how/if the 23 Ave one will connect with the Saddleback Road bike lanes in some way. However, those really need to be redesigned into something less half-baked in the next few years when Blue Quill/Steinhauer/Ermineskin/Duggan gets neighborhood renewal. Or maybe 106 St undergoes collector renewal through those areas. It's kind of pathetic coming out of the new infrastrusture through Pleasantview to get dumped out on those painted bike lanes on crumbling, wide roads.
 

Coun. Paquette taking some heat for this new road allocation along Hermitage Rd in Clareview.

Separated pedestrian space. Seperated/dedicated bike lane. Space for vehicle parking. Driving lane. Drivers not happy though. Giving up/sharing any space for some drivers is like road space has been stolen from them.

That car in the background is still there. Looks like it hasn’t moved at all. There are two tickets on the windshield. I suggested to 311 that they locate and check on the owner to see if they’re ok.

IMG_8110.jpeg

For the most part, people are respectful of the lane. Facebook warriors were disproportionally louder than their numbers would suggest.
 
That car in the background is still there. Looks like it hasn’t moved at all. There are two tickets on the windshield. I suggested to 311 that they locate and check on the owner to see if they’re ok.

View attachment 592457

For the most part, people are respectful of the lane. Facebook warriors were disproportionally louder than their numbers would suggest.

Is the driving lane really tight for vehicles like people are posting?
 
Is 66st south of the whitemud part of the 100mil plan?

Drove south on it today and noticed the entire west side (across from the LRT) is ripped up. Are they adding a MUP where it used to be a sidewalk?
 
Is 66st south of the whitemud part of the 100mil plan?

Drove south on it today and noticed the entire west side (across from the LRT) is ripped up. Are they adding a MUP where it used to be a sidewalk?

Not part of plan. Here are the 2024 projects.
  • 106 Street from Princess Elizabeth Avenue to 118 Avenue
  • Princess Elizabeth Avenue from 103 Street to 106 Street
  • 102 Avenue from 136 Street to 139 Street
  • Fort Road/Manning Drive from Belvedere Way to 153 Avenue
  • 50 Street from 153 Avenue to 162A Avenue
  • 66 Street from 137 Avenue to 153 Avenue
  • 153 Avenue from Griesbach Road to 82 Street
  • 97 Street from 153 Avenue to 160 Avenue
  • 23 Avenue from 50 Street to 85 Street
  • 23 Avenue from 111 Street to 119 Street
 
Not part of plan. Here are the 2024 projects.
  • 106 Street from Princess Elizabeth Avenue to 118 Avenue
  • Princess Elizabeth Avenue from 103 Street to 106 Street
  • 102 Avenue from 136 Street to 139 Street
  • Fort Road/Manning Drive from Belvedere Way to 153 Avenue
  • 50 Street from 153 Avenue to 162A Avenue
  • 66 Street from 137 Avenue to 153 Avenue
  • 153 Avenue from Griesbach Road to 82 Street
  • 97 Street from 153 Avenue to 160 Avenue
  • 23 Avenue from 50 Street to 85 Street
  • 23 Avenue from 111 Street to 119 Street
Speaking of the plan, there's a few months left in construction season, has there been any updates on the 2024 routes?
 
Speaking of the plan, there's a few months left in construction season, has there been any updates on the 2024 routes?

Bucket #1 started first and both MUP projects on Princess Elizabeth are close to completion.
  • 106 Street from Princess Elizabeth Avenue to 118 Avenue (pictured below) - FINISHED.
  • Princess Elizabeth Avenue from 103 St to 106 St - FINISHED
  • 102 Avenue from 136 Street to 139 Street
  • Fort Road/Manning Drive from Belvedere Way to 153 Avenue
20240830_165508.jpg


Bucket #2 as has been reported above is in progress but not as far along as bucket #1
  • 23 Avenue from 50 Street to 85 Street
  • 23 Avenue from 111 Street to 119 Street
Bucket #3 - not sure where things are at but it was scheduled to begin last but still be completed this year.

  • 50 Street from 153 Avenue to 162A Avenue
  • 66 Street from 137 Avenue to 153 Avenue
  • 153 Avenue from Griesbach Road to 82 Street
  • 97 Street from 153 Avenue to 160 Avenue
 
Last edited:
Not part of plan. Here are the 2024 projects.
  • 106 Street from Princess Elizabeth Avenue to 118 Avenue
  • Princess Elizabeth Avenue from 103 Street to 106 Street
  • 102 Avenue from 136 Street to 139 Street
  • Fort Road/Manning Drive from Belvedere Way to 153 Avenue
  • 50 Street from 153 Avenue to 162A Avenue
  • 66 Street from 137 Avenue to 153 Avenue
  • 153 Avenue from Griesbach Road to 82 Street
  • 97 Street from 153 Avenue to 160 Avenue
  • 23 Avenue from 50 Street to 85 Street
  • 23 Avenue from 111 Street to 119 Street
Hmm. I wonder if it’s part of the LRT contract then? Looking on google maps, it looks like there’s been sections slowly being upgraded the last 4 years all along 66st. Very good to see!!
 
The multi-use trails were needed on 75 and 66 Street. In the past, Edmonton's industrial areas and arterial roads did not have much for sidewalks.
 