Foolworm
Active Member
Does not look like a 4th lane in each direction can be added - is that the case?
No, but let's hope it's never needed -- we'll have failed as a City if so.
Rather, a third lane would (should) be added to north Henday.
Does not look like a 4th lane in each direction can be added - is that the case?
Looks like they’re starting to dig the trench in which the highway will go below the overpass.View attachment 543185
Hard to tell from this image, but is there active construction happening on the overpass? Or are they merely still doing utility work etc?
Supposed to be an “underpass” built there……unclear on the timelines though. Thought it was supposed to be at the same time as the now under construction 127th st overpass.I wonder if there's any kind of construction setup going on at the Yellowhead north of Blatchford.
Pretty sure demo of the Northgate Industries building is ongoing based on what I saw driving by recently. That will have to come down before anything further is done probably.I wonder if there's any kind of construction setup going on at the Yellowhead north of Blatchford.
I've gotten so used to going the long way around that I'm not sure Fort Road even still exists north of the Yellowhead. It's like some sort of mythical tale passed down by the ages.It's almost mid-March and Fort Road is still down to 1 lane per direction under the CN Rail bridge. When oh when will Fort Road be fully operational again?
It doesnt appear work was done on the direct fort road lanes over the winter. They must be waiting for spring to continue on the additional lanes. Collector roads and earth moving seemed to happen over winter though.It's almost mid-March and Fort Road is still down to 1 lane per direction under the CN Rail bridge. When oh when will Fort Road be fully operational again?