kcantor
Senior Member
they must have subcontracted the design to the same group that did the design for the utility building at the end of 95th street for transed and the city of edmonton.Looks like the Leg Annex was demolished to make way for some generator
View attachment 476408
View attachment 476409
View attachment 476410
View attachment 476411