Winspear Centre Completion Project | 29.87m | 4s | Winspear Centre | Andrew Bromberg

What do you think of this project?


  • Total voters
    53
BP:

Jul 18, 2022
Commercial Final
STRUCTURAL FRAME ONLY 2nd level of above grade "music box superstructure" on top of the first level of the above grade superstructure (B.P. 341529008-036) and the existing one storey underground parkade (B.P. 286547690-002). Remainder of building to follow in separate permit submission-- "Francis Winspear Centre for Music
$8,500,000
10210 - 97 STREET NW
What's the purpose of breaking the BPs into phases like this? Quicker turnaround time for the city?
 
710B8CDC-8D2A-4921-AF66-CEB065C52347.jpeg

progress
 
Ish... but from what I understand there have been multiple changes in scope, budget and design.
So should we be preparing for a watered down, bait and switch version of the original plan ala the Stanley Milner Library

Given the scope, design and budget change, I cant imagine we are going to be seeing something that will blow our minds out of the water that is better than the original version everyone was promised...
 
So should we be preparing for a watered down, bait and switch version of the original plan ala the Stanley Milner Library

Given the scope, design and budget change, I cant imagine we are going to be seeing something that will blow our minds out of the water that is better than the original version everyone was promised...
From what I see in the permit, the main features of the original version are intact, such as the 'signature' terracotta roof. I'm hopeful the end result will look great.
 