Winspear Centre Completion Project | 29.87m | 4s | Winspear Centre | Andrew Bromberg

What do you think of this project?


  • Total voters
    48
So should we be preparing for a watered down, bait and switch version of the original plan ala the Stanley Milner Library

Given the scope, design and budget change, I cant imagine we are going to be seeing something that will blow our minds out of the water that is better than the original version everyone was promised...
From what I see in the permit, the main features of the original version are intact, such as the 'signature' terracotta roof. I'm hopeful the end result will look great.
 
This is unusual I wonder if they are going to fill in the gap with a different colour concrete.
0777C050-C8D5-4380-A351-F8C2A7C60489.jpeg
 
Are you sure Gene Dub isn't in charge of construction?
I'm almost sure the Winspear construction was hit by the same issues as other construction projects: pandemic, staffing issues, supply issues and the weather.
 
It appears the work is limited, there are only a few days a week the crews are on site.
 