Winspear Centre Completion Project | 29.87m | 4s | Winspear Centre | Andrew Bromberg

What do you think of this project?


  • Total voters
    53
2A5E6DD3-FC2E-46B6-B16B-ADB3DC3FF6BA.jpeg
 

Attachments

  • B50A69BB-7673-4983-80F9-EF3006D631FA.jpeg
    B50A69BB-7673-4983-80F9-EF3006D631FA.jpeg
    414.5 KB · Views: 97
It seems a bit odd for this to be changing like this at this point. Is there some problem with funding expected not being received or cost overruns?
 
Most definitely. I am still hopeful that the north side at loading dock and the new stage door which I assume will be in the area as the loading docks will be completed in the next few months which will greatly help the basic operations of the building.
 

Back
Top