Who recalls going to a pre-approval open house with the developers and a lot of beer back in what, 2005 or 6?
Who recalls going to a pre-approval open house with the developers and a lot of beer back in what, 2005 or 6?
C.2. Strathearn Heights (Rezoning / Formal)
Adrian Benoit - GEC Architecture
Motion of support with conditions
● The DC2 provision should include more specificity regarding the proposed
heights of buildings, including podium, mid-rise and high-rise/tower forms.
● Consider reducing the proposed 850m2 floor plate for the north tower, and
reconfiguring the west tower as a high-rise form.
● Further exploring and refining the tower top, tower massing, materiality and
articulation to reinforce a base / tower / top configuration, contribute to a
distinctive skyline profile, and reduce the visual mass of the buildings.
● The use of the townhouse is an appropriate typology for the mews context and
should be extended further along the linear greenspace to better define this
corridor.
● Urban design refinements are required to better define and support aspects of
urban village and transit plaza, mews and supporting urban realm development
(including short-term surface / convenience parking) – both private and public.
These refinements should consider and include urban design components that
define and nurture neighbourhood identity, support the neighbourhood and
local economy, foster frequent and meaningful contact, create an accessible and
sustainable urban realm; and promote a sense of comfort and inclusivity.
● Stronger commitment to public art is needed throughout the development, in an
integrated and thoughtful manner.
CARRIED
According to Nearctic's website, they plan to break ground in 2021. https://www.nearctic.com/property/strathearn-heights-apartments/Does anyone have any new info on this project? Been considering moving into Strathearn Heights from El Mirador, But obviously won't do that if this project is still going forward.
Well, that"s a no then. Thank you for the info.According to Nearctic's website, they plan to break ground in 2021. https://www.nearctic.com/property/strathearn-heights-apartments/
@Avenuer may have some insight into the permit timing and whether anything has formally been submitted. Sounds like they may be waiting for LRT construction to mostly be complete similar to Bonnie Doon redevelopment I presume.
Nothing new on this one yet. I do suspect they are waiting until the LRT is operational before submitting anything for construction.According to Nearctic's website, they plan to break ground in 2021. https://www.nearctic.com/property/strathearn-heights-apartments/
@Avenuer may have some insight into the permit timing and whether anything has formally been submitted. Sounds like they may be waiting for LRT construction to mostly be complete similar to Bonnie Doon redevelopment I presume.
I got an Ad on FB for this yesterday, and asked when demolition was to start. They replied, "5 to 10 years." Still, won't take my chances.Nothing new on this one yet. I do suspect they are waiting until the LRT is operational before submitting anything for construction.