PERMIT_DATE August 03, 2018
PERMIT_NUMBER
JOB_CATEGORY Commercial Final
ADDRESS 10035 - 108 STREET NW
NEIGHBOURHOOD DOWNTOWN
JOB_DESCRIPTION To install soldier piles (partial Shoring) and excavation only, "Center West" building. All piles are placed 1.5' (0.45m) inside of the Property Line, Building footprint, 147.5' x 102.6'. A Hoarding (temporary fence) shall be placed on Private Property unless a permit is obtained to place on a public thoroughfare.
BUILDING_TYPE Engineering (490)
WORK_TYPE (04) Excavation
FLOOR_AREA
CONSTRUCTION_VALUE 15,000
ZONING CMU
 
P8100416.jpg

P8100418.jpg P8100417.jpg
 

Attachments

  • P8100416.jpg
    P8100416.jpg
    232.1 KB · Views: 792
  • P8100418.jpg
    P8100418.jpg
    323.9 KB · Views: 392
  • P8100417.jpg
    P8100417.jpg
    307.4 KB · Views: 373
I was hoping for a complete redo like the building on the southwest corner of Jasper Ave. and 109 Street. The developer is playing this very conservatively. I am sure the demand for housing in the Government Precinct will fill the building -- no doubt. Could have been better -- disappointing!
 
Shoring for the new building underway, the annex of the existing building being demolished.

P8300501.jpg

P8300500.jpg P8300499.jpg P8300502.jpg P8300503.jpg

Guess that pedway is going to have to go.
 

Attachments

  • P8300501.jpg
    P8300501.jpg
    387 KB · Views: 771
  • P8300500.jpg
    P8300500.jpg
    347.7 KB · Views: 405
  • P8300499.jpg
    P8300499.jpg
    283 KB · Views: 348
  • P8300502.jpg
    P8300502.jpg
    360.2 KB · Views: 391
  • P8300503.jpg
    P8300503.jpg
    307.6 KB · Views: 377
There is a possibility now, with a residential core for more retail/hospitality at street level -- that, to me, is the most exciting potential for this development.
 
PERMIT_DATE September 14, 2018
JOB_CATEGORY Commercial Final
ADDRESS 10035 - 108 STREET NW
NEIGHBOURHOOD DOWNTOWN
JOB_DESCRIPTION To complete excavation and install TEMPORARY lagging and tiebacks (soldier piles installed under permit 015) - Center West.
BUILDING_TYPE Engineering (490)
WORK_TYPE (04) Excavation
CONSTRUCTION_VALUE 4,775,000