Foolworm
Active Member
The recent interim update report has further refinements to what was quoted, along with a concept plan showing the upgrades that would be needed to enable these routes (mostly repurposed lane space). All things considered, it is fairly achievable within the target date of 2030 -- provided that funding is available in the next budget cycle.