News   Apr 03, 2020
 9.1K     3 
News   Apr 02, 2020
 10K     0 
News   Apr 02, 2020
 3.3K     0 

10308 116 Street | ?m | ?s | Leston Holdings | Arc Studio

At grade pretty much. Should start rising soon.

6195CDF8-6BD8-4955-973A-2634A4026699.jpeg
 
I find it odd that the eastern half of the first floor is concrete construction while the rest of the build is sticks. is that a req. for CRUs?
 

Back
Top