I'm guessing there could be more LRT construction on 102 Avenue next spring, probably starting at 105-107 Street. If the Oilers have an extended run in the Stanley Cup playoffs, 103-104 Street could be more difficult for construction.
More importantly there still needs to be engineering design work to be completed to integrate with the existing line as per the video.
 
More importantly there still needs to be engineering design work to be completed to integrate with the existing line as per the video.
I think that’s moreso relating to the system integration, not construction, so it shouldn’t impede their construction timeline
 