Winter tends to slow this progress and can bring it to a near halt at times... really weather dependent from now until March.
 
IMG_1432.jpeg
 
How much longer before we see gravel moved off site? I wonder f they need to replace all the top soil from decades of dripping oil, gas from all the vehicles.
I'd imagine a lot of surface soils will have to be removed so that the site can be graded to whatever the design is and prepped where infrastructure is placed.
 