mcr
Active Member
Permit includes demolishing the old school when done.New (replacement?) francophone school.
Looks like it'll be 2 schools (probably 1 building though?); a K-6 with 445 student capacity and a 7-12 with 335 student capacity.
Permit includes demolishing the old school when done.New (replacement?) francophone school.
Hmmm....good point....maybe we should be looking at Whyte instead of DT. 106th St could be the One Properties' Dog Park....Hat @ 106, eh? Interesting. That wouldn't be their Strathcona one.
There's an empty lot on Whyte & 106, plus there's lots of empty lots on 106 St downtown.
They own the site at 10323 106 St based on this comment in the former “North” project thread.Hat @ 106, eh? Interesting. That wouldn't be their Strathcona one.
There's an empty lot on Whyte & 106, plus there's lots of empty lots on 106 St downtown.
Is that near this empty lot on University Ave? It seems like it's been empty for a while.
View attachment 691252
View attachment 691251
Does anyone know if the current building for École Michaëlle-Jean (the 7-12) near 101 Ave and 83 St is also being demolished and replaced as part of this complex? On the Major Projects website they're listed together: https://majorprojects.alberta.ca/details/Solution-for-École-Michaelle-Jean-Gabrielle-Roy/10933Permit includes demolishing the old school when done.
Looks like it'll be 2 schools (probably 1 building though?); a K-6 with 445 student capacity and a 7-12 with 335 student capacity.
Yes. At least that was the original plan. Both schools will be housed in the new building.Does anyone know if the current building for École Michaëlle-Jean (the 7-12) near 101 Ave and 83 St is also being demolished and replaced as part of this complex? On the Major Projects website they're listed together: https://majorprojects.alberta.ca/details/Solution-for-École-Michaelle-Jean-Gabrielle-Roy/10933
Kind of shame since Gabrielle-Roy has a nice building, but at least the architecture firm they've hired seems pretty good.
That would be a great lot to see filled up, especially if a Massey Ferguson project moves forward too.They own the site at 10323 106 St based on this comment in the former “North” project thread.




