archited
Senior Member
45 storeys would dwarf both CN tower and Epcor... maybe? Structurally with that huge transfer slab (already poured) it could feasibly be 45 storeys over all
Maybe not 'now', but will they proceed at all? Yes.Curious to see if they proceed with the tower or not at this time.
62% occupied now - as of May 12, 2025.They must have had a big push last week with their Open House - according to their site - 110 units are available = 57% occupancy. Prior to last week they were sitting at a 43% occupancy.
I like that you have that in-depth intel.62% occupied now - as of May 12, 2025.
No in-depth anything.....lolI like that you have that in-depth intel.
Wait, to "get into" the Pedway from Stationlands, residents would have to have a secure and safe entrance that is closer to their homes than to travel half to Churchill to enter. No?No -- further along the line, between RAM and City Hall
It is not temporaryI don't think that's temp...
I’m pretty sure that’s not correct. As far as I know that “arc” at grade is architectural expression only and has no relationship to what’s happening at the parkade/loading ramp accesses, pedestrian movement or structural grid below the plaza level Although it does mirror the LRT alignment below P4. The main loading docks for EPCOR Tower as well as the new residential towers cross under that arc at P1.The pedway from Stationlands is accessible all the way along the new residential structure and also from the existing office building following the curve of the pedway that is expressed at grade as well. ...