Stationlands Residential Towers | 90m | 25s | Qualico | DIALOG

What do you think of this project?


  • Total voters
    42

occidentalcapital

Active Member
Member Bio
Joined
Jun 21, 2020
Messages
757
Reaction score
2,961
Maybe the training wheels haven't yet come off, but I fear they may be falling into the trap of doing just what the administration wants without much or original thought, like the previous council did.

It is unfortunate when the democratic process gets subverted like this.
I think the Mayor is the one responsible for articulating an overall vision, getting buy-in from council, and a good admin will respond to that. I just don't see Sohi doing that (yet). He's been advocating a bit on homeless/mental supports/addiction, but in terms of actual actions, I'm not seeing much.
 

Avenuer

Senior Member
Member Bio
Joined
Mar 8, 2019
Messages
1,845
Reaction score
10,796
Location
Inside the Henday
46E31A6B-2448-4928-8D38-3E448B7C89E0.jpeg
E8B57ED2-8FD8-454C-840E-7C0047FE4ECD.jpeg
C9CDA25B-6894-44C6-A20A-6B705045FF1E.jpeg
 

MCXavierL

Active Member
Member Bio
Joined
Oct 7, 2011
Messages
456
Reaction score
2,874
Location
Edmonton, AB
BP:

2022-09-08
Commercial Final
To construct a mixed use building (285 Dwellings) 5 storey Podium with West MidRise Tower. Mercantile uses on the main floor, 3rd floor Assembly use, renovation and addition to the existing underground parkade and a pedway connection. Station Lands North
$76,413,268
10457 - 101 STREET NW
 

archited

Senior Member
Member Bio
Joined
Dec 21, 2015
Messages
5,500
Reaction score
14,299
Location
Ojai
@Avenuer are you sure that the second tower hasn't been permitted? The crane behind the CN Tower that is being assembled is going to be at least 10 storeys above grade, suggesting a high-rise assemblage.
 

Avenuer

Senior Member
Member Bio
Joined
Mar 8, 2019
Messages
1,845
Reaction score
10,796
Location
Inside the Henday
@Avenuer are you sure that the second tower hasn't been permitted? The crane behind the CN Tower that is being assembled is going to be at least 10 storeys above grade, suggesting a high-rise assemblage.
Yes, the east crane behind CN Tower is needed as the west crane radius will not reach the entirety of the 5-storey podium that is being built along with the west 14-storey mid-rise (total 285 dwellings). The east tower is still planned for Phase 2 of construction.
 

MacLac

Active Member
Member Bio
Joined
Jun 18, 2021
Messages
720
Reaction score
1,675
Yes, the east crane behind CN Tower is needed as the west crane radius will not reach the entirety of the 5-storey podium that is being built along with the west 14-storey mid-rise (total 285 dwellings). The east tower is still planned for Phase 2 of construction.
Wait what? Only the podium for the East tall tower? I thought both towers were going to be under construction simultaneously. Now I'm sad......
 

The_Cat

Senior Member
Member Bio
Joined
Sep 15, 2020
Messages
1,311
Reaction score
5,081
Looking north from Jasper/100 Street, the CN Tower has stood out for years. Now the Stationlands tower will be in the background.
 

Clearshades

Active Member
Member Bio
Joined
Aug 4, 2020
Messages
555
Reaction score
1,270
Stop panicking! that crane is going to be for a tower WHICH HAS YET TO GARNER A SIMPLE PERMIT. Like architected hinted that the height situated for it will clearly be for a tower, so once a permit is in place, after the podium is done, the tower goes up. There are 6-8 months or possibly longer just to reach ground elevation...
 

Top