News   Apr 03, 2020
 8.3K     3 
News   Apr 02, 2020
 9.6K     0 
News   Apr 02, 2020
 3.1K     0 

Riley's 108 Street Redevelopment | 20.2m | 6s | J+S Architect

Walk ups I'm assuming? This building doesn't need CRUs imo.

Eh, if there's anything that could save this design deuce it would be having a main floor like mercury block.

But God willing, this project will turn out to be yet another insurance scam and burn down when it's 90% complete.

Mysteriously. Despite having a fire hall 2 blocks away.

Screencap this post and check back in 2 years ;)
 
Eh, if there's anything that could save this design deuce it would be having a main floor like mercury block.

But God willing, this project will turn out to be yet another insurance scam and burn down when it's 90% complete.

Mysteriously. Despite having a fire hall 2 blocks away.

Screencap this post and check back in 2 years ;)
What an absolutely moronic thing to say.
 

Back
Top