Member Bio
- Joined
- Sep 22, 2015
- Messages
- 10,218
- Reaction score
- 23,075
- Location
- Edmonton, Alberta, Canada
Official groundbreaking ceremony was today.
Richie Lam, CEO
Mayor Don Iveson:
Richie Lam, Michael Dub, Gene Dub:
Two shoring rigs now on site:
Btw, confirmed with Michael Dub, the final height will be 138m including the architectural crown elements. I know some larger numbers have been tossed around on other forums, but this one's straight from the architect's mouth.
Richie Lam, CEO
Mayor Don Iveson:
Richie Lam, Michael Dub, Gene Dub:
Two shoring rigs now on site:
Btw, confirmed with Michael Dub, the final height will be 138m including the architectural crown elements. I know some larger numbers have been tossed around on other forums, but this one's straight from the architect's mouth.
Attachments
-
P4190574.jpg1.2 MB · Views: 1,142
-
P4190578.jpg1.2 MB · Views: 1,354
-
P4190571.jpg1.4 MB · Views: 866
-
P4190581.jpg1.2 MB · Views: 959
-
P4190588.jpg1.3 MB · Views: 1,083
-
P4190590.jpg1.1 MB · Views: 1,351
-
P4190593.jpg854.8 KB · Views: 978
-
P4190595.jpg1.2 MB · Views: 967
-
P4190617.jpg1.4 MB · Views: 780
-
P4190615.jpg1.1 MB · Views: 836
-
P4190611.jpg1.2 MB · Views: 1,260
-
P4190603.jpg1.2 MB · Views: 797
Last edited: