There is low-rise going up directly north where that adorable heritage building was until the carelessness/arson.
 
Ah oh. These guys are serious they brought their own Porta potty.
3998F529-954C-4D4B-A21D-B98F90102D97.jpeg
4785E4BF-A8F8-4E9F-B091-FFD722944652.jpeg
 
They are removing the snow and dumping so soil/gravel on the slope I’m assuming to get equipment in
 
  • Like
Reactions: God
GS does mostly subcontracting to EPCOR for utility work. We can all pray and hope this is them upgrading the site utilities for the future tower, but I'm guessing we're going to be disappointed when it turns out they just got access to the site for ease of adjacent utility work.
 
Drove by this afternoon and they were moving dirt for something like Glenco's pictures show. I have no idea what they're doing though.
 