Connect Centre | 56.3m | 16s | ONE Properties | DIALOG

What do you think of this project?


  • Total voters
    59
Jan. 5 - Crane base in, looks like prep for a raft slab underway.

P1050082.jpg


P1050086.jpg


P1050093.jpg
 

Attachments

  • P1050082.jpg
    P1050082.jpg
    1.1 MB · Views: 433
  • P1050086.jpg
    P1050086.jpg
    1.5 MB · Views: 528
  • P1050093.jpg
    P1050093.jpg
    1.1 MB · Views: 437
PERMIT_DATE January 16, 2017
PERMIT_NUMBER 162139487-050
JOB_CATEGORY Commercial Final
ADDRESS 10324 - 103 STREET NW
NEIGHBOURHOOD DOWNTOWN
JOB_DESCRIPTION To construct 2 temporaryTOWER CRANES for construction for an underground parkade PHASE 2 (ICE District) 7Jan2017 to 3Jan2018 for south crane "G"; to 17Jan2018 for north crane "B"
BUILDING_TYPE Engineering (490)
WORK_TYPE (01) New
FLOOR_AREA 10
CONSTRUCTION_VALUE 20,000
ZONING AED, HA
 
Isn't that the old render? They haven't updated their renderings properly in a while, since there is a mix of the old in one of their media kits, the middle one, and the newest one is nowhere to be seen yet.
 
Who knows, their website still lists the Stantec Tower as 60 floors and the email they sent out today shows the old and taller Greyhound land tower lol, they are keeping us guessing that's for sure.
 
I imagine the most recent design that they submitted would be what they're ultimately planning on building. It sounds like from what Dave said before that they were giving quite a bit of information on the tower as opposed to previously where everything was kind of just concept images. It is cool though that all three towers will be out of the ground by December!
 

Back
Top