The west wide 111 St shared-use path south north of 37 Ave (Greenfield) appears to be approaching, if not complete now.
You can now pretty much ride continuously between Century Park station and Harry Ainlay without crossing the street on a nice, wide asphalt path. Then you can connect to the Royal Gardens shared-use path to go west, or towards the pedestrian bridge over the Whitemud.
@MacLac will get a kick out of thisThis is in Calgary but thought it was worth posting because the line painting job is baffling. The traffic calming median almost looks too big for vehicles to navigate with parked cars - winter will be more of a challenge.
View attachment 685740View attachment 685741
Why are we not pouring real concrete medians????100st curbs in place from 83 to 80 Ave.
From 80 to 76 Ave it will be MUP but that work hasn't started yet.
View attachment 685733View attachment 685734
Why are we not pouring real concrete medians????
Surely this isn’t that much cheaper, especially when you factor in how easily they break.
These will be easier to remove this way…
Painted during an earthquake it seems!This is in Calgary but thought it was worth posting because the line painting job is baffling. The traffic calming median almost looks too big for vehicles to navigate with parked cars - winter will be more of a challenge.
View attachment 685740View attachment 685741