Yellowhead Trail Upgrades

Interesting. They way the roads are laid out indicates things were getting built out while the interchange still existed, likely until they were hindering traffic flow more than they helped it.

Actually found this in the 1983 wards and polling map:
HOLY OF HOLIES! A map without West Ed Mall on it.
 
Can I blow your mind a little more?

Screenshot 2025-09-23 133924.png


I was curious if it ever got built out. It seems like they got as far as grading the land for the subdivision. 81 to 90 Ave:
1758656839304.png


88 Ave to 95 Ave, you can see the grade prep for 95 Ave, and the complex where Italian Centre and Spence Diamonds is.
1758657196515.png
 
Current freeway construction update:
Some work happening around 121 St. Almost all of the buildings are now gone.
115 St interchange bridge appears to be coming along fine. One can see it rising above the current Yellowhead Trail.
Plenty of activity around 107 St.
66 St is still quiet.

p.s. apologies for not taking any pics - I was driving.
 
^Thank you
Although I was wondering more specifically when they will transfer traffic to the bridge so they can remove the temporary road to the west of the bridge and finish the digging and begin the final road underneath. I am assuming that east/west configuration will remain as is until the final opening.
 