News   Apr 03, 2020
 7.3K     3 
News   Apr 02, 2020
 7.7K     0 
News   Apr 02, 2020
 2.6K     0 

Miscellaneous

DGLEbj3VwAA5XIN.jpg:large

John Young‏ @YoungerJW Aug 1
OML is excited to be working with K5 Investment Group and building the new Marriott Fairfield at the Edmonton International Airport
 
TRANSACTION
Retail Lease
Mixed-Use Buildng
715 SF – 18,724 SF

SIZE
  • Unit 1: 4,443 SF
  • Unit 2: 4,945 SF
  • Unit 3: 3,171 SF
  • Unit 4: 5,450 SF
  • Unit 5: 715 SF
FEATURES
  • Available: Immediately
  • Municipal: 10404 Jasper Avenue, Edmonton, AB
  • Legal: Lot 217A, Block 4, Plan 0721254
  • Zoning: JAMSC (Jasper Avenue Main Street Commercial Zone)
  • Basic Rent: Negotiable
  • Op Costs: $16.41 PSF (2017 est.)
  • Access: 104 Street & Jasper Avenue
  • Loading: Dock and grade leveling
HIGHLIGHTS
  • Up to 18,724 SF of space available
  • 115’ feet of footage along Jasper Avenue
  • High profile location that anchors one of Edmonton’s most iconic intersections
  • Quick access to the financial core and the Edmonton Ice District

View attachment 117649

https://omada-cre.com/listings/cecil-place/
http://docs.omada-cre.com/CecilPlace.pdf

Looks like a restaurant of some sort will be the first taker:

Reference ID: Job No 262753305-001
Description: To change the use from General Retail to Restaurant use (464.5 sq m) with outdoor patio (55.8 sq m)
Location: 10404 - JASPER AVENUE NW
Plan 0721254 Blk 4 Lot 127A
Applicant: STANTEC
Status: New
Create Date: 9/21/2017 2:28:05 PM
Neighbourhood: DOWNTOWN
 
The July 18 EDC minutes are finally posted. Not sure what took so long, but some interesting things including Bell Tower landscaping redo:

B.1. Bell Tower (Development Permit Application)
McElhanney - Stefan Johansson
F. Cavaliere left the meeting due to a conflict.
P. Spearey read the comments of the Development Planner.
MOVED: A. Zepp Motion of support with conditions.
Provide the following to the satisfaction of the Development Officer:
● Provide solutions which incorporate accepted best practice in universal design with respect to, but not limited to: ○ Curb ramp locations and orientation; in particular, at the corner of 101 Street and 103 Avenue; and ○ Sufficient differentiation of tactile surfaces
● Address potential tripping hazards caused by the bench design which incorporates a gradual slope to grade and may not be perceptible by persons with visual impairments
● Additional design refinement to ensure winter interest through means such as colour, lighting and material selection
● Revised sun shadow study, considering the impact of the surrounding context, with respect to shadows cast, to demonstrate adequate sunlight is available for the growth of plant material as shown.
● Confirmation whether existing trees are being relocated and / or salvaged
SECONDED: T. Antoniuk
CARRIED
FOR THE MOTION: R. Labonte, C. Craig, T. Antoniuk, M. Figueira, S. Kaznacheeva, H. Mapstone, A. Zepp
 
Another swing-and-a-miss for Gooch...

B.2. Village at 105 (Development Permit Application)
EFG Architects - Ed Gooch
P. Spearey read the comments of the Development Planner.
MOVED: M. Figueira Motion to table.
In the opinion of the Committee the application is incomplete with regard to the:
● Design of the rooftop garden.
● Design of ground floor units and the streetscape interface to activate the public realm while creating defensible space for residents.
● Lighting effects / impact on the building (eg. Nighttime rendering).
● Clarification of the intended users of the building, and the corresponding impact on the building program.
● Design of the courtyard as an integral element of the building program.
● Design of the courtyard, including entrances into the building, for universal accessibility.
● Accommodation of visitor parking.
● Integration of a daycare into the building, and the impact on other building and site planning program requirements.
SECONDED: A. Zepp
CARRIED
FOR THE MOTION:R. Labonte, T. Antoniuk, F. Cavaliere, D. Deshpande, M. Figueira, S. Kaznacheeva, H. Mapstone, A. Zepp

https://www.edmonton.ca/city_government/documents/PDF/EDCMinutesAug1.pdf
 
DHobhdEUwAAsrBE.jpg:large

DHobhdDV0AAkKFq.jpg:large

Beljan Development ‏@Beljandevt 22 hours ago
Raise em up! Tipton Investment Bldg hoisted up 10' for a new basement. This project is going to be killer! #heritage #adaptivereuse

EDC Aug 1:

B.3. Tipton Building (Development Permit Application)
Hodgson Schilf Evans - Ian Evans
P. Spearey read the comments of the Development Planner.
MOVED: F. Cavaliere Motion of support.
SECONDED: T. Antoniuk
CARRIED
FOR THE MOTION:R. Labonte, T. Antoniuk, F. Cavaliere, D. Deshpande, M. Figueira, S. Kaznacheeva, H. Mapstone, A. Zepp

https://www.edmonton.ca/city_government/documents/PDF/EDCMinutesAug1.pdf
 
Interesting, looks like they're looking to snag a bigger tenant for this space:
https://www.google.ca/maps/@53.5183449,-113.4974779,3a,90y,90.47h,106.18t/data=!3m7!1e1!3m5!1slBbgcJfxEv8z9I1eKgmYjQ!2e0!6s//geo2.ggpht.com/cbk?panoid=lBbgcJfxEv8z9I1eKgmYjQ&output=thumbnail&cb_client=search.TACTILE.gps&thumb=2&w=96&h=64&yaw=78.754&pitch=0&thumbfov=100!7i13312!8i6656

PERMIT_DATE September 19, 2017
PERMIT_NUMBER 254014564-003
JOB_CATEGORY Commercial Final
ADDRESS 8209 - 104 STREET NW
NEIGHBOURHOOD STRATHCONA
JOB_DESCRIPTION To construct interior alterations to an existing mixed use commercial building: consolidate 3 CRU's into 1 (8209, 8211, 8213) returning to SHELL condition, install a Barrier Free Vestibule and to construct exterior alterations replacing windows and doors.
BUILDING_TYPE Malls, Office/Retail (512)
WORK_TYPE (03) Interior Alterations
FLOOR_AREA 3,214
CONSTRUCTION_VALUE 80,000
ZONING DC1, DC1, DC1, DC1, DC1

Edit: Looks like it's a BMO:

PERMIT_DATE September 21, 2017
PERMIT_NUMBER 254014564-004
JOB_CATEGORY Commercial Final
ADDRESS 8211 - 104 STREET NW
NEIGHBOURHOOD STRATHCONA
JOB_DESCRIPTION To construct interior alterations to an existing mixed use building for BMO Southside. Scope of work includes removing 2 demising walls and 2 new barrier free washrooms.
BUILDING_TYPE Office Buildings (520)
WORK_TYPE (03) Interior Alterations
FLOOR_AREA 3,214
CONSTRUCTION_VALUE 600,000
ZONING DC1, DC1, DC1, DC1, DC1
 
Last edited:
Facade improvement coming to this building:
https://www.google.ca/maps/@53.5417...4!1sCam86kVGH7o2UpaskQE4eA!2e0!7i13312!8i6656

PERMIT_DATE September 19, 2017
PERMIT_NUMBER 256831324-003
JOB_CATEGORY Commercial Final
ADDRESS 10130 - 105 STREET NW
NEIGHBOURHOOD DOWNTOWN
JOB_DESCRIPTION To construct exterior alterations to an existing multi-use commercial building (facade improvement)
BUILDING_TYPE Office Buildings (520)
WORK_TYPE (03) Exterior Alterations
CONSTRUCTION_VALUE 82,000
ZONING UW
 
Mill Creek school replacement plans unveiled
upload_2017-9-28_10-38-41.jpg

An artist's rendering of a newly rebuilt Mill Creek School. Edmonton Public Schools hopes the new building will be ready for use by January 2019. EDMONTON PUBLIC SCHOOLS
Construction will begin next month on an $11.5-million new Mill Creek school to replace a 1946 building parents say is outdated and decrepit.

Following lobbying from parents, the Edmonton public school board also decided at a June closed-door meeting to pull $1 million from capital reserves to build extra room in the school to lease to a daycare centre.

“I’m very grateful and very relieved. Frankly, I don’t know what I would do if there wasn’t daycare in the school,” said Chloe Chalmers, whose children are currently enrolled in Grade 2 and a privately run daycare at the existing Mill Creek School at 9735 80 Ave.

In 2007, the Ritchie neighbourhood school dodged closing by retaining only its Spanish bilingual program, which is open to students from across the city. Last year, it had 301 students enrolled.

Although the school district received provincial approval in October 2014 to replace the school, and secured design funding in January 2015, the province promised no construction money until fall 2016.

After spring planning sessions with people in the community, the district announced last week shovels will be in the ground shortly.

59356510-81tcobeocd-s-jpg.jpg

An artist’s rendering of the interior of a new Mill Creek School in the Ritchie neighbourhood. Construction is slated to start on the new building in late October. EDMONTON PUBLIC SCHOOLS

http://edmontonjournal.com/news/local-news/mill-creek-school-replacement-plans-unveiled
 

Attachments

  • upload_2017-9-28_10-38-41.jpg
    upload_2017-9-28_10-38-41.jpg
    74.3 KB · Views: 403
Looks like this crappy building is getting replaced with a 2-story health services building:
https://www.google.ca/maps/@53.5059...4!1seEEXkImAt0MsYCKzbKOPPw!2e0!7i13312!8i6656

Reference ID: Job No 238578329-008
Description: To construct and operate a two Storey Health Services Use building.
Location: 6925 - GATEWAY BOULEVARD NW
Plan 2416HW Lots 10-11
Applicant: HODGSON SCHILF ARCHITECTS
Status: New
Create Date: 9/27/2017 9:35:28 AM
Neighbourhood: STRATHCONA JUNCTION
 
No movement on idea to build mid-sized stadium in Edmonton despite soccer’s successes
With all kinds of encouraging signs that soccer in Canada — and specifically in Edmonton — is on the upswing, the owner of FC Edmonton doesn’t see any thing new that he’s hyped about in efforts to get a mid-sized stadium built in our city.

Edmonton, along with Vancouver, Montreal and Toronto, are Soccer Canada’s four host cities for Canada-USA-Mexico World Cup soccer bid confirmed Wednesday.

Meanwhile Major League Soccer (MLS) earlier this week appointed Diego A. Moratorio to the new position of general manager for MLS Canada, in a bid to help grow interest north of the border with sponsorship increases at the league and club level.

Vancouver, Montreal, and Toronto are in the MLS, while Edmonton is in the struggling North American Soccer League.

FC Edmonton owner Tom Fath realizes the ball is still in city council’s court. The city continues to follow the medium-sized stadium strategy that council approved in 2012.

The council strategy would consider expanding the 5,000 seat stadium, if the Eddies sold out every game. Fath said attendance is improving, but they’ve only had a couple of sell outs so far.

https://globalnews.ca/news/3785885/...tadium-in-edmonton-despite-soccers-successes/
 

Back
Top