Lets hope there is better engineering on this one. I worked on the last 2 back in the 90s or late 80s. Back when we still used pneumatic controls.
The first 2 were mirror images. literally. there was an issue with cooling and ventilation. when we looked closer at it , we noticed the duct sizing was all wrong in one tower. when you turn the drawing to match the first tower everything matched. the other tower was 90 degrees off so the heat loads could not be reduced by the ventilation. Its since been fixed.
We'll see if this actually gets built, would be nice to see that lot filled. I do seem to recall however, a sign on that property for quite some time 5-6 years ago saying this was "coming soon" so I wouldn't hold my breath. This seems like one of those projects that keeps getting revived, only to be axed again.