Avenuer
Senior Member
It's a joke...You needed to wear a gas mask. Seriously??? I swear to god, people are becoming more squeamish every year.
It's a joke...You needed to wear a gas mask. Seriously??? I swear to god, people are becoming more squeamish every year.
I still saw barricades on the one parallel to the traffic lanes as recently as last weekend.Is the pedestrian bridge open yet?
I ran across the ped bridge about a month back. It was all done except some drainage concrete on the side of the path that looked to not be in place yet at either end. And the asphalt on the west side connecting to the existing trail needed to be better connected. Not impressed. If it was a car road, it would have been finished. Sigh.
I feel like we are starting to see som early signs of a return to a focus on construction productivity. A few projects across the city seem to be doing fairly well and I’m optimistic it’s a sign.Drove over the Rainbow Valley bridge. Its nice to See Graham still working on this. Bridge crews usually shut down. Looks like they are trying to get all the rebar set and then tarp it. I don't think we will see any concrete poured till spring.
that looks like they are done for the season. lots of snow on it.I imagine that the southbound bus lane isn't too far from opening.
Interesting. Ets not want to change their schedule mid season? That would seem odd.that looks like they are done for the season. lots of snow on it.
We're ready for it whenever it opens. ETS doesn't control construction, much to our dismay.Interesting. Ets not want to change their schedule mid season? That would seem odd.




