Terwillegar Drive Expansion

I ran across the ped bridge about a month back. It was all done except some drainage concrete on the side of the path that looked to not be in place yet at either end. And the asphalt on the west side connecting to the existing trail needed to be better connected. Not impressed. If it was a car road, it would have been finished. Sigh.
 
I ran across the ped bridge about a month back. It was all done except some drainage concrete on the side of the path that looked to not be in place yet at either end. And the asphalt on the west side connecting to the existing trail needed to be better connected. Not impressed. If it was a car road, it would have been finished. Sigh.

I'm not sure if it was this bridge, but I heard opening delayed due to faulty surface material that was used.
 
Drove over the Rainbow Valley bridge. Its nice to See Graham still working on this. Bridge crews usually shut down. Looks like they are trying to get all the rebar set and then tarp it. I don't think we will see any concrete poured till spring.
 
Drove over the Rainbow Valley bridge. Its nice to See Graham still working on this. Bridge crews usually shut down. Looks like they are trying to get all the rebar set and then tarp it. I don't think we will see any concrete poured till spring.
I feel like we are starting to see som early signs of a return to a focus on construction productivity. A few projects across the city seem to be doing fairly well and I’m optimistic it’s a sign.
 