Maclab Garneau | Laurent | Eleanor | 98.14m | 30s | Maclab Development

What do you think of this project?


  • Total voters
    47
According to the published routes, 87 Ave will have BRT running down it so I imagine we could see it getting redone as part of that.

That may be a longer term project, as I'm pretty sure the East-West BRT will initially use 114th Street, Belgravia Road and Fox Drive on the South Side. Hope they build a new bridge sooner rather than later though!
 
That may be a longer term project, as I'm pretty sure the East-West BRT will initially use 114th Street, Belgravia Road and Fox Drive on the South Side. Hope they build a new bridge sooner rather than later though!
IMG_9972.jpeg

IMG_9977.jpeg

IMG_9974.jpeg

109 St and 87 Ave action!

IMG_9976.jpeg

B2 and B6 to run along 87th Ave (at least the part east of the UAH). (You’re right no action for the west part of 87th Ave.)

Hope we get money for BRT build out in 2027-30 budget.
 

Attachments

  • IMG_9976.jpeg
    IMG_9976.jpeg
    2.1 MB · Views: 64
  • IMG_9975.jpeg
    IMG_9975.jpeg
    392.8 KB · Views: 67
Last edited:
Imagine if that had been rapid transit instead of the VLSE. But money talks, and there will never be a bridge through there, transit or otherwise
 
Imagine if that had been rapid transit instead of the VLSE. But money talks, and there will never be a bridge through there, transit or otherwise
You'd have pitchforks from the rich folks in Laurier Heights and Parkview banging at the door of City Hall if that was proposed haha
 
Sounds like Chipotle is getting close to opening. Lucky uni kids. Back in my day I had to settle for Feta & Olives in HUB in order to get food poisoning.
I'm curious to see how the competition plays out between Chipotle, Bar Burrito (two of them, including the one in SUB), and Burrito Libre. I have a small soft spot for Chipotle having lived in college towns in the States, but based on reviews of their other Edmonton locations it does seem like they bungled their rollout a bit.
 

Back
Top