News   Apr 03, 2020
 7.3K     3 
News   Apr 02, 2020
 7.6K     0 
News   Apr 02, 2020
 2.6K     0 

Low Level Bridge

20230706_212844.jpg
 
I saw an electric sign that read:
"TRAFFIC DELAYS"
"LOW LEVEL BRIDGE"
"STARTING NOV 20"

I can't find anything on the COE website for the Low Level Bridge (as usual).

There is supposed be rehab work taking place in 2024 according to a Global News article from 2019.
 
I saw an electric sign that read:
"TRAFFIC DELAYS"
"LOW LEVEL BRIDGE"
"STARTING NOV 20"

I can't find anything on the COE website for the Low Level Bridge (as usual).

There is supposed be rehab work taking place in 2024 according to a Global News article from 2019.

There was already a round of repair work done in 2020 when.. uh... cracks were discovered in the piers:

 
This bridge cant be replaced until the refurb a and close down of the High Level has been completed.

I hope its just replaced with a simple elegant clean design.
IMG_5712.jpeg
 
Here is some additional information on the Low Level Bridge Rehabilitation. The goal is extend the lifespan for over 20 years.
https://building.edmonton.ca/projects/eB-10817?tab=home
Darn, so start date on the re-furb - I thought we were convinced they start it in 2024? The project is currently funded to completion of the preliminary design phase.

Forecasted Schedule​

January, 2027​

 
Darn, so start date on the re-furb - I thought we were convinced they start it in 2024? The project is currently funded to completion of the preliminary design phase.

Forecasted Schedule​

January, 2027​

With the high level slated to start June of 2025
 

Back
Top