CplKlinger
Senior Member
The city launched a survey on non-LRT mass transit, which closes August 5.
No wonder the city doesn't have transit very accessible for me, they don't even acknowledge my post code is part of the city!The city launched a survey on non-LRT mass transit, which closes August 5.
What area are you in? Does it have on demand transit?No wonder the city doesn't have transit very accessible for me, they don't even acknowledge my post code is part of the city!
Blatchford, no on demand transit yet.What area are you in? Does it have on demand transit?
Every map I checked shows Davies, both on the map and as timing points. The description on the ETS page still shows Millgate.Interestingly, route 510X has disappeared and no other route has been inserted as a Valley Line replacement at this point; and Millgate still appears on individual route maps.
Yes they did some updating overnight.Every map I checked shows Davies, both on the map and as timing points. The description on the ETS page still shows Millgate.
The schedules I'm looking at for the 4 and 5 both show the stub trips you note. Indeed, the 4's are on a 10 minute headway, so 5 minute frequency between the University and Boonie Doon.Yes they did some updating overnight.
If these are the final fall schedules that are posted, there are some major cuts coming. Here are just two examples: #4 between Bonnie Doon and University down to every 12 minutes during peak (instead of every 6 last year); #5 between Westmount and Downtown down to every 15 minutes (instead of 7/8 all day). I'm assuming there are more updates to come.