@StopDropandLOL As far as I know, yes. There's already brick going up on the east elevation (see post #100), and you can see on the west elevation where the crane is the still-exposed green insulating foam where the brick will be installed along that side.
I like a lot about this project, especially at the pedestrian level. However, there is more spandrel and less brick it seem's. If that green insulation is where the brick will be, then it seem's less. We will soon see.