The MacLaren | 85.04m | 27s | Edgar | DIALOG

What do you think of this project?

  • I neither like nor dislike it

    Votes: 0 0.0%
  • I dislike it a lot

    Votes: 0 0.0%

  • Total voters
    41
Monday,

Wabamum & Sask Dr. storm 2019-08-05 041.JPG
Wabamum & Sask Dr. storm 2019-08-05 045.JPG
Wabamum & Sask Dr. storm 2019-08-05 068.JPG
Wabamum & Sask Dr. storm 2019-08-05 070.JPG
 
I have some reservations as well, mainly regarding the ground floor treatment (i.e. brick vs. original stone columns, lack of awnings, etc.). The second and third floors are well done, however.

Thats where my main point of contention is as well. To me the brick columns feel kind of oppressive, especially compared to the glassiness of the original design;
199802

Provincial Archives of Alberta photo A15028
 
Looks like there is still the possibility of a wheelchair ramp to the left in this photo -- Inspector alert ?‍♀️?
 
Since I have had to push a wheel chair around a bit. they could have still maintained the grade from the curb and cleared the door. This is a main sidewalk , it should have been a straight shot from the intersection.

They could have angled it down from the third cut.

As it is a can see able body walkers tripping on this as well. You don't expect a stair on a sidewalk.
 

Back
Top