Vacs
Active Member
I heard that too and then apparently Ellisdon put in for a pretty substantial extra right after they got on site.Really? Is the signage still there?
I was told the switch to EllisDon was because they were going to build the tower five floors taller for cheaper than what Clark was contracted for. Be pretty shocking (and a huge waste of time and money) if they changed GCs again.
Something seems shady