The Jameson | 53.95m | 17s | Open Sky | Acton Ostry

What do you think of this project?


  • Total voters
    44
I can imagine what happened here. When the design revision took the project from 17 to 22 stories and the GC was tasked with determining the extra cost, the "EXTRA" price came back higher than anticipated and the owner felt like he was getting ripped off. When angry words were exchanged over and over again the owner and GC reached a point of no return -- a few "F-Us" led to a no-win situation and the GC was fired.
 
I can imagine what happened here. When the design revision took the project from 17 to 22 stories and the GC was tasked with determining the extra cost, the "EXTRA" price came back higher than anticipated and the owner felt like he was getting ripped off. When angry words were exchanged over and over again the owner and GC reached a point of no return -- a few "F-Us" led to a no-win situation and the GC was fired.
Contractually I don't think it was that simple.
 
  • Like
Reactions: God
^^^^ Root cause -- maybe?
Root cause is almost always money.
It's not easy for an owner to fire a Gc over a change when their is a disagreement in money. Same as it's not always easy for a Gc to fire a subtrade if there is a disagreement with money due to a change

I'm sure there is more to the story
 
I called and left a message. If I hear back I will let you know. There must be a city of Edmonton contact for this project, too? Wouldn't they know of any changes?
This is also a project that was part of the building incentive program in 2021.
 
How can this be? This was the little baby that was nurtured and fed by the newly assembled planning and permit dept to expedite the permit process and work closely with developers to see that their dreams came true!
 

Back
Top