Symphony Tower Edmonton | ?m | 27s | Allen Wasnea | KENNEDY

What do you think of this project?


  • Total voters
    20
Mar. 2

P3020704.jpg
 

Attachments

  • P3020704.jpg
    P3020704.jpg
    1.6 MB · Views: 418
Tough site given the limited staging area. Should speed up once they get to the tower portion though. Suspect it will be slow going until then with the town homes on the bottom.
 

Back
Top