Metro Line LRT | ?m | ?s | City of Edmonton

Surprisingly At least something is finishing early 🤔 on schedule and I think it’s not P3
Don't think the P3 is the issue, the citys choice of contractor was, looks like the city chose a better contractor this time, remember the Walterdale wasn't a P3, the city chose a bad contractor
 
Blatchford gate station will be the emptiest station ever
Doesn't have to be. Look at South Campus. It's built almost in the middle of nowhere but is so well-used because of all the bus connections (in fact, that drives ridership at a lot of stations). If they did that for Blatchford Gate, it should be fine.
 

Back
Top