Metro 78 | 23m | 6s | Pinto Properties | Frank Hilbich

What do you think of this project?

  • I dislike it

    Votes: 0 0.0%
  • I dislike it a lot

    Votes: 0 0.0%

  • Total voters
    42
There happened to be some activity when I went by today actually! Barricades around the trees, and the MUP is blocked off, looks like they are doing some drainage work.

I think some more machinery has shown up as well, there seems to be more than the 2 that were sitting there after they did the partial excavation in the summer.


PXL_20250131_005105626 - Copy.jpg
PXL_20250131_005146226 - Copy.jpg
PXL_20250131_005222810 - Copy.jpg
 
There Were BPs for both buildings

To construct FOOTINGS AND FOUNDATIONS ONLY for an apartment building - Metro 78 - North Building.
Jan 8, 2025
To construct FOOTINGS AND FOUNDATIONS ONLY for an apartment building - Metro 78 - South Building.
Jan 10, 2025
Don’t hold out on us…..share as many BP’s as you want as they come up.😉
 
Progress is being made! Looks like the north excavation is finished and they are starting some formwork. Seems shallow though, are they not doing a parkade for this?


Edit: Looking back at earlier posts, there is indeed no vehicle parking for this one. (Also subsidized transit passes and a loaner cargo bike, amazing!)

Should come up to grade fairly quick, maybe they'll even catch up with Westrich down the street 😮

PXL_20250227_024040748 - Copy.jpg
 
Last edited:
Have we seen these renderings before? Kind of dig them.....
Screenshot 2025-03-01 161842.png
 
Hmmmmm….something smells fishy here. A shallow basement with no retaining walls under construction yet. High end building with a no name builder……
 
Hmmmmm….something smells fishy here. A shallow basement with no retaining walls under construction yet. High end building with a no name builder……
I believe there is no parking due to the very close proximity to McKernan/Belgravia station.

I'm a huge fan of this kind of development, and I believe it will be more profitable for developers, and more affordable for residents that won't have to subsidize expensive parking despite never using it.
 
Hmmmmm….something smells fishy here. A shallow basement with no retaining walls under construction yet. High end building with a no name builder……
They only had their Footings and Foundation permit issued, still waiting on the main 'structural' BP. It's still under review
 
BPs issued (2025-04-22):

To construct a new 6 storey apartment buildings (71 Dwellings). --Metro 78 -South building--

To construct a new 6 storey apartment buildings (71 Dwellings) with a cafe on main floor (separate permit required for the cafe TI) --Metro 78-North building--
Alright I’ll update the spreadsheet with this news lol
 

Back
Top