There are still plenty of supply-chain issues.
Agreed most of my projects have very long lead times. Air Handling units used to be 12 weeks. now they can be 30 or more. I had some VFDs that were promised last Dec but will now be delivered by the End of June. And Emergency generators were at 50 weeks. Its not the big stuff but small components that are not available so most of the products I need do not get shipped until every part is there.
 
Noticed some activity in front of the much anticipated Ace Coffee today, maybe the coming soon sign is finally correct.

Also noticed the McDonalds signs for the seemingly abandoned location in Commerce place are finally gone.

The McDonalds has been boarded up. I wonder what will happen to that space?

20230425_151135.jpg

20230425_151147.jpg
 
It's a start, very little step forward and positive... but what a hill to climb.
 
  • Like
Reactions: God
It's a start, very little step forward and positive... but what a hill to climb.
Its certainly not the time for Manulife to pat itself on the back about getting a new tenant, they sure have a heck of a lot of work to do still.

Is that all the space Ace is taking, just in front or is that temporary until something behind is finished?
 
Its certainly not the time for Manulife to pat itself on the back about getting a new tenant, they sure have a heck of a lot of work to do still.

Is that all the space Ace is taking, just in front or is that temporary until something behind is finished?
The kiosk is temporary while they finish building out their space.
 