Enbridge Centre | 110.64m | 28s | Pangman | DIALOG

What do you think of this project?

  • I neither like nor dislike it

    Votes: 0 0.0%
  • I dislike it

    Votes: 0 0.0%
  • I dislike it a lot

    Votes: 0 0.0%

  • Total voters
    13
Last crane coming down today.

IMG_20160525_142105.jpg
 

Attachments

  • IMG_20160525_142105.jpg
    IMG_20160525_142105.jpg
    1.9 MB · Views: 665
Last edited:
Been a quiet week development-wise, but here's something...

IMG_20160607_093255.jpg


Apparently that steel was NOT for signage, but in fact part of the roof element. Perhaps it was designed to be retractable to enable crane access to the HVAC and other rooftop equipment?
 

Attachments

  • IMG_20160607_093255.jpg
    IMG_20160607_093255.jpg
    595.9 KB · Views: 579
Last edited:
As I recall from previous descriptions, there was to be a prominent "light box" on the roof of the building.
 
Lighting the way to a new meme in architecture -- actually I am glad to see more and better use of light effects in the new buildings downtown.
 

Back
Top