cpnfantstk
Active Member
What does concept rendering mean? To me, that means it's not the final design. I don't really understand that term though.Poor Graham, they have to fly their name over this pig.
What does concept rendering mean? To me, that means it's not the final design. I don't really understand that term though.Poor Graham, they have to fly their name over this pig.
Thank god.From EDC June 19:
C.2. ICE District Block BG (Development Permit)
10324 103 Street NW
Dave Moore - Dialog Design
MOVED: D. Brown Motion of Non-support
● The design intends to lift the mass of the building off the ground plane; however, the perceived mass of the building has visually increased. Similarly, reducing the transparency and articulation and variation in materiality on the second and third floor of the building negatively impacts the interface with the plaza and adjacent streets.
● Generally, the tower lacks articulation adequate to its scale and size. In particular, greater variation of materials should be considered on the west and east side of the small tower and on north side of the tall tower.
● Loss of public access to roof and programming opportunities on rooftop area is a great detriment to the project and diminishes the overall public realm of Ice District.
● The extent of the third floor interior mechanical space is not clearly delineated in the drawing package. Futhermore, the exterior rooftop mechanical space is not sufficiently screened from view by residents of the tower or adjacent developments.
SECONDED: A. Zepp
CARRIED
FOR THE MOTION: W. Sims, A. Zepp, T. Antoniuk, D. Deshpande, S. Kaznacheeva, C. Holmes, D. Brown, B. Nolan
https://www.edmonton.ca/city_government/documents/EdmontonDesignCommittee_June_19_2018_Minutes.pdf
This is the first thing I'm really disappointed about. Now whenever I see a commercial project promising a lavish non-commercial public space, I'll wonder "How are they planning to shut that down?" Certainly if there's any economic pressure on a project, the public portions will be the first things cut back. I wonder if these projects start out with true intentions of providing public space, or if they think "We'd like to do that and we'll get to it if we can," or if it's really just "It's just there to sell it to the City, then it's cut."From EDC June 19:
● Loss of public access to roof and programming opportunities on rooftop area is a great detriment to the project and diminishes the overall public realm of Ice District.
You know, the more I think about this, the possibility exists that this is a very sage move on behalf of Katz. He has gone back to the City to try to garner funds for the plaza. Would it be a stretch to think that this less-than-mediocre effort for the tower B project might figure into that strategy. Maybe he is trying to get the City engaged in all "public amenities" for the project... maybe the public roof garden is part of that push. Maybe the theaters haven't gone away. Maybe for the sake of creating a (do I have to acknowledge) "rendering" and spending, say, $10,000.00 or so to push this at the City, he has no intention of building this at all. Maybe it is just a card in his hand for dealing with the City. Remember "back when" he took a trip to Seattle hinting at the notion that he might move the Oilers there -- that was a strategic move to engage the City re investing in the arena. I am thinking that this might be a similar ploy -- spend a few bucks to make the City think that the public amenities are going away, just to get them engaged in an investment mode.
Reference ID: Job No 234919092-007
Description: To amend the approved Development Permit number 234919092-001 by reducing the Height from 141.3 m to 137.65 meter high mixed Use Tower; and reducing the Commercial podium from 3 to 2 Storeys including a common lobby, twelve (12) General Retail Stores, three (3) Restaurants (60% of total Floor Area as Public Space), one (1) Professional, Financial and Office Support Services, with accessory Residential Amenity Area including accessible outdoor rooftop area on the rooftop podium; with an Apartment Housing Tower (adding a floor of Residential and increasing Dwelling units from 568 to 582 from the 3rd to 41st floors); with mechanical rooms on the 42nd floor; and to construct exterior and interior alterations. (Block BG Tower)
Location: 10324 - 103 STREET NW
Plan 1722545 Blk 2 Lot 7
10305 - 104 AVENUE NW
Plan 1722545 Blk 2 Lot 12
10324 - 103 STREET NW
Plan 1722545 Blk 2 Lot 10
Applicant: DIALOG
Status: In Development Review
Create Date: 6/18/2018 10:17:49 AM
Neighbourhood: DOWNTOWN
New thread title:
Ice District Tower B | 138m | 42s | ONE Properties | DIALOG