as I recall, the city put a kibosh on the Keg's design with a blank back wall facing 104ave. With the demise of the car wash there's a great space now immediately east of MEC.
 
First floor
1741814434972.png


Second floor
1741814522582.png
 
I have to think that if it was to be the restaurant or the Rec Room that disclosure now would not be a problem. The bank and Simon's would want to keep things quiet until their City clearances have been achieved.
 
I think only ECC has the square footage Simons needs.

It's still feasability at this point. More than anything the large thick roughly 400mm (16") concrete floors and the massive amounts of rebar is hampering our ability to place the amount of plumbing fixtures this tenant needs. We're coming up with ideas like raising the rooms requiring lots of plumbing so we can either used pre sleeved piping connections or find a spot where we can core down, or having chase spaces that could achieve the same thing without the diffuculty of having multiple levels. I don't think they planned on these spaces being anything more than retail and office, but the tenant is eager to make this space work being in such a high visiblity location.
 

Back
Top