50 Street Widening & CP Rail Grade Separation

Grade separation at 75th St is one of the most overlooked things imo. I do hope it gets done at some point in the not so distant future.
Grade separation is needed at both 75th street and 34th street. Although the 34th street one needs to be done by Sherwood Park.
75th street is busier but the trains tend to sit on the tracks on 34 street as well as doing the back and forth track switching.

Though the crossing that needs the most done to it right now is the south bound crossing of the south track on 99th street. The grading there is bad enough now that you bounce your back bumper in a car if you go over it faster than 40kmh.

As to 50th street. I would love to see a BRT in a dedicated lane running Millwoods-Capilano-Northlands. If they ever build a bridge over the river switching it to Millwoods-Capilano-Clairview would be ideal.
 
Does anyone know if pedestrian/bicycle access across the rail tracks still exists? I have to head down that way soon.
 
No pictures, but they're paving the north side of the ramp and the right turn off of 90 Ave today.

Lines are painted on the south side of the ramp now too.
No pics again, but after three days paving last week, they painted the lines on the north side ramp and crosswalk today. Still some minor asphalt at the intersection to be completed but this looks very close now.
 