News   Apr 03, 2020
 8.3K     3 
News   Apr 02, 2020
 9.5K     0 
News   Apr 02, 2020
 3.1K     0 

Search results

  1. F

    Metro Line LRT | ?m | ?s | City of Edmonton

    It's a modular design, just extend it. Need an extra shelter? Use the one from Millgate.
  2. F

    LRT Safety

    They can install the gates at platform level instead.
  3. F

    Edmonton METS Plan (1969 Historical Freeway Plan)

    I was hoping with Exhibition lands that the City could make the rest of WGD free-flowing, but nope. Fox Drive really should be a freeway along with Belgravia Road. It is what it is.
  4. F

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    ETS does not have a customer service mentality, they have a passenger service mentality. This is because ETS is not a business run for profit.
  5. F

    Metro Line LRT | ?m | ?s | City of Edmonton

    I think it should be reused for Ellerslie while the City decides how to cross the road.
  6. F

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    There's the 511 that runs from 12 - 2:30 am, but I agree that the hours should be extended to have 24 hour availability.
  7. F

    Metro Line LRT | ?m | ?s | City of Edmonton

    That was the announcement, yes. Maybe you can reach out to the City to clarify?
  8. F

    Metro Line LRT | ?m | ?s | City of Edmonton

    Jan 20, the City website just updated with an announcement.
  9. F

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    Yes. Granted, the Valley line vehicles have less row seating, if the high floor vehicles follow suit then that difference widens some more. For reference, I was using the LRT design guidelines which lists the AW2 capacity of the SD-160 at 146 pax, lower than the U2 capacity of 160 pax.
  10. F

    LRT Safety

    https://www.seattletimes.com/seattle-news/transportation/sound-transit-looks-to-other-cities-as-it-considers-fare-gates/ The Urbanist article with the draft report that was referenced is here...
  11. F

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    That rock pad looks like it's floating on the water. It looks like river levels are low in the picture but I can definitely see Accidental Beach sticking around given how high it is.
  12. F

    Quarry Ridge - Strathcona County Pedestrian Footbridge | ?m | ?s | River Valley Alliance

    Sweet. I wonder what the chances of another accidental beach are (probably close to none)...
  13. F

    Quarry Ridge - Strathcona County Pedestrian Footbridge | ?m | ?s | River Valley Alliance

    Well it's popped up again in the Mass Transit Plan, albeit as a long-term BRT crossing (short term is a detour to Quesnell). The Whyte-87 Ave BRT route that would use it replaces Centre LRT. But getting back on topic, I wonder if work was stymied due to the warm weather and potential for thin...
  14. F

    Metro Line LRT | ?m | ?s | City of Edmonton

    Anyone planning to line up for the first train when new NAIT station opens?
  15. F

    ETS Bus and General Transit Improvements

    Ugh. No crossbar either then, guess that's how she went right through.
  16. F

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    No, I'm referring to just the first part of the post, Calgary and Toronto's vehicles have nothing to do with my original question.
  17. F

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    In the first place, the capacity assumptions that the Siemens and Bombardier vehicles uses are different. The Flexity vehicle capacity assumes AW2, or seating plus 4 ppm. The 190 person capacity of the high floor Siemens vehicles is based on AW3, seating plus 6 ppm instead.
  18. F

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    Wait... A Flexity vehicle only has 1.5x the capacity of a SD-160 despite being almost twice the length?
  19. F

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    It was already cleaned on NYE. Makes sense that they want to have everything spick-and-span for the event rush
  20. F

    Terwillegar Drive Expansion

    Has construction on the SB Whitemud bus lane started? There's a dirt ramp roughly where it's supposed to go. It's very steep though, might just be a temporary access for equipment.

Back
Top