Be interesting to see how much further along that bridge is now.
Still 4 years easily. I wouldn’t get hopes up.Based on the pace, I wonder if they will open ahead of schedule. Seems like it would be possible
Still 4 years easily. I wouldn’t get hopes up.
Construction is progressing well. I’d say the thing I’m most worried about is the system integration with the SE line.Still 4 years easily. I wouldn’t get hopes up.
Have they finalized if TransEd is going to be contracted to be the operator of the SE line also?Construction is progressing well. I’d say the thing I’m most worried about is the system integration with the SE line.
I don’t think there is another choice? Sole source contract I guessHave they finalized if TransEd is going to be contracted to be the operator of the SE line also?
The contract states that the OMF should be done by the end of 2025. I wonder if it’ll be done by then
Well it appears that the core structure is built and they are now enclosing the building. I did see a number of crew working when I took the pictures. But I guess only time will tell. So far though Marigold has appeared to be keeping on schedule.The contract states that the OMF should be done by the end of 2025. I wonder if it’ll be done by then
With?Walked past 102 street stop at about 4:45 this evening. Every one of the shelters was occupied.
The train left without themWith?