My guess is all the roadwork (track bed, utilities etc…) stations and signals, signage etc, are not anywhere close.I re-read that a few times thinking I missed something, seems way faster than expected. Hopefully not too far fetched?
My guess is all the roadwork (track bed, utilities etc…) stations and signals, signage etc, are not anywhere close.I re-read that a few times thinking I missed something, seems way faster than expected. Hopefully not too far fetched?
Just saw the CBC clip and it mentioned that Marigold is hoping to test trains November of 2026. Idk how they’re going to do it but best of luck to them lolHonestly I don’t see how it’s reasonable tbh. They have ~5% of the OCS wire up right now, no track on 102, no steel up for any of the stops. I think finish building by end of 2027 is reasonable. Commissioning of the trains themselves has already started, which is maybe what he’s referring to there
In the video the reporter says "the companies goal is to start testing the tracks by next November". TransEd was testing track back by January 11, 2020. Ground breaking was April 2016, so less than 4 years from ground breaking. VLW ground breaking was May 2022, so testing by November 2026 is actually a bit longer than 4 years. That's not a particularly exact measure of progress mind you, but seems about right. At the time the VLSE was limited to testing south of 51 Ave, but, it was none the less basic testing by pushing an LRV around."He expects all of the building to be done and testing to start in 2026 and hopes the city approves an accelerated work plan, like was used on 104 Avenue, again"
Woah testing to start in 2026??