Valley Line LRT | TransEd/Marigold | City of Edmonton

The End. :-(
1760666747258.png
 
Looking at the video and photo footage, it looks like a lot of trackbed and catenary pole foundations have been completed from Lewis Farms to 182 Street, Meadowlark Road, and SPR from 142 Street to Groat Bridge.
 
Beginning October 27, 2025, sections of Stony Plain Road between 132 Street and 139 Street will be reduced to a single shared lane during overnight hours (9 p.m. to 6 a.m. Monday through Saturday) to facilitate the installation of Overhead Catenary System poles (OCS - a network of wires suspended above railway tracks to supply electricity to electric trains, which draw power using a pantograph that contacts the overhead wires).

To accommodate this:

  • Sections of the eastbound lane or westbound lane on Stony Plain Road between 132 Street and 139 Street will be closed during overnight hours only (9 p.m. to 6 a.m., Monday through Saturday).
  • Eastbound and westbound traffic will share a lane.
  • Flagging staff will be on hand to maintain traffic.
  • While this work takes place, access to/from Stony Plain Road from streets and alleys adjacent to the work will be closed during overnight hours only (9 p.m. to 6 a.m., Monday through Saturday).
  • The traffic configuration during these closures will be similar to that shown in the above linked notice (Lane Closures on Stony Plain Road between 129 Street and 132 Street).

Pedestrian access will be maintained; however, detours may be in place. Flagging staff will be on hand to assist pedestrian movements.

This work will occur during overnight hours only and is expected to last two weeks.
 