The actual Q2 2025 report was published today. No updated progress figure since it's the same time period, but there's new details about specific segments.The latest update on Building Edmonton came out:
Marigold Infrastructure Partners (MIP) and the City have developed a plan to accelerate roadwork and trackwork in key areas in 2025. This work will result in significant traffic restrictions, but will reduce the overall duration of traffic impacts by more than half. The accelerated plan will also get many of the roads into their final configuration by the end of 2025. Work also continues at many other sites along the alignment, including at stops and stations, the Lewis Farms storage facility, Gerry Wright operations and maintenance facility, and the elevated guideway along 87 Avenue. MIP has achieved 43.4% progress (as of the end of June 2025) as measured by the Independent Certifier. The first Light Rail Vehicle manufactured by Hyundai Rotem Company is expected to be shipped from South Korea at the end of June 2025, arriving in Edmonton at the end of July.
This seems incredibly quick, they already have asphalt down in the south side of 104ave in the section between 109 and 110st. I swear they only switched traffic from south to the north side a few weeks ago? View attachment 683137
PME had been working almost 24/7 in that area for the last couple of weeks. Seems like they made a big push to get it doneThis seems incredibly quick, they already have asphalt down in the south side of 104ave in the section between 109 and 110st. I swear they only switched traffic from south to the north side a few weeks ago? View attachment 683137
yessir and allard hall just out of frame. Its been awesome seeing the business building go up. Between macewan, the LRT and the MUP it couldnt be a better area to be completely pedestrianized. (but not without 109st losing a few lbs)Great pic - some of downtown Edmonton's most modern, interesting buildings, especially when business wing is done.
Hopefully that parking lot fills in with something suitable to contribute greater to this area.
PME seem new to the game here, are they a new subcontractor for this? Cant recall seeing their logo before summer reallyPME had been working almost 24/7 in that area for the last couple of weeks. Seems like they made a big push to get it done