Valley Line LRT | TransEd/Marigold | City of Edmonton

How we feeling about them being done all elevated sections by EOY? That was their goal I know. Is the pacing going to make that possible with what’s left west of WEM?
Im not sure how long it’ll take them to move the gantry back west, or how long it’ll take to jump over the girders at WEM station. If they can erect segments until December it’s possible.
 
Stony plain looking east at 142st.

0F24125E-AACD-4D8C-AE8C-7902FD1B8065.jpeg


156st looking south at 95ave

5FE1C5AC-BADF-474A-87C5-2001EFA2FDAB.jpeg
 
I'm curious to know how the Valley Line LRT is co-existing with the Taste of Edmonton?
I really didn't see a problem, The Taste starts north of the line, just 100th north of Jasper is totally closed this year.

Great connections, just walk off and BAM, you're there!

***edit, slight change since my original posting. The Churchill connector is closed to the north side (facing taste of edmonton), so unless you are getting off the 1st tram car, you have a block walk, same as anyone using the LRT and coming up thru the Churchill connector...
 
Last edited:

Back
Top