How would that be warranty? Warranty is to fix defects, not some idiot driving into the side of it.So it now has to be sent back to Kingston for repairs? Under warrant??
This is not excusable! I can KINDA get my head around something happening close to the front of the train, when it's something like a very close call and you can blame someone for thinking "there was enough time" this was dead on the middle of the train, you can't blame it on lack of signaling or anything.I don't think that'll buff out. I didn't get back with my camera soon enough to catch a picture of the truck that smoked it.
View attachment 462810View attachment 462811
View attachment 462809
They are going to have to install crossing arms to protect the trains. I imagine the cost to repair a train is much greater than the cost to repair a truck and there are a limited number of trains. I appreciate that they want it to integrate into the community as much as possible, but at the end of the day, Transed and by extension the City, need to protect their assets.I don't think that'll buff out. I didn't get back with my camera soon enough to catch a picture of the truck that smoked it.
View attachment 462810View attachment 462811
View attachment 462809